Almost every dispute between a business and a supplier starts in the same place: a quote that was not specific enough, agreed by two people who each read it differently.

This applies whether you are buying a website, a generator installation, or a year of marketing. Here is what a quote should contain before you sign it.

The five things that must be written down

What you get, itemised. Not "a website" but the number of pages, what happens to the content, whether hosting is included and for how long. Not "marketing" but which channels, how often, and what gets reported. If you cannot tell from the quote whether a specific task is included, it is not.

The price, and what could change it. A fixed figure, plus a plain statement of what would cause it to move. There are legitimate reasons a price changes mid-project. There is no legitimate reason for them to be a surprise.

The timeline, and what it depends on. Most projects are delayed by the client, not the supplier -- usually waiting on content, approvals, or access. A good quote says so, and names what it needs from you and when.

What happens afterwards. Who maintains it. What support costs. What happens in month seven when something breaks. This is where the real cost of a cheap quote usually hides.

Who owns what at the end. Your domain, your accounts, your data, your files. This should be stated, and the answer should be you.

Phrases that should worry you

"Starting from." This is not a price. It is an opening position, and the final number is discovered after you are committed.

"And any other work required." Required by whom, judged by whom, charged at what rate.

Hourly with no cap. Hourly is fine for genuinely open-ended work, but without a cap or an estimate you have signed a blank cheque. Ask for a not-to-exceed figure.

"SEO included" with no description. Included how? A meta description is technically SEO. So is a year of content work. These are not the same purchase.

No mention of ongoing costs at all. Hosting, licences, domain renewal and support are real. A quote that omits them is not cheaper, it is incomplete.

Questions worth asking before you sign

What is explicitly not included? A supplier who can answer this crisply has thought about the scope. One who says "everything is included" either has not, or is about to discover otherwise.

What do you need from me, and by when? This tells you whether they have run a project before.

What happens if I want a change halfway through? There should be a process and a rate, not an argument.

Can I speak to a client you did this for? Not a testimonial on a website -- an actual conversation.

Who will I be dealing with day to day? Ideally a named person who will still be there in month six.

On choosing the cheapest

Sometimes the cheapest quote is simply the most efficient supplier. Often it is the one that left things out, and the missing pieces arrive later as additions you cannot refuse because the work is half done.

The way to tell is to compare scope rather than totals. Put the quotes side by side and mark what each includes. A cheaper quote covering two-thirds of the work is not cheaper.

The test that matters

A good quote lets you compare suppliers honestly and hold whoever you pick to what they wrote. A bad one is vague enough that any outcome can be argued as compliant.

If you cannot tell from a quote exactly what you are buying, ask until you can. A supplier who resists that question is telling you something useful, at no cost to you.